We extend the WITCH model to consider the possibility to produce and trade electricity generated by large-scale concentrated solar power plants (CSP) in highly productive areas that are connected to demand centers through High Voltage Direct Current cables. We test the attractiveness of the CSP option by imposing a global cap on Greenhouse gases concentration equal to 535 ppm CO2-eq in 2100, with and without constraints to the expansion of nuclear power and IGCC coal with carbon capture and storage (CCS). We find that it becomes optimal to produce with CSP from 2040 and to trade CSP electricity across the Mediterranean from 2050. Therefore projects like DESERTEC seem to be premature. After 2050, CSP electricity shares become significant. CSP has a high stabilization cost option value: depending on the constraints, it ranges between 2.1% and 4.1% of discounted GDP in the Middle East and North Africa (MENA), between 1.1. and 3.4 in China, between 0.2% and 1.2% in the USA, between 0.1 and 1.3% in Eastern Europe and between 0.1 and 0.4% in Western Europe. A moderate level of subsidy to invest more and earlier in CSP might increase welfare. However, large-scale deployment should occur after 2040. We also show that MENA countries have the incentive to form a cartel to sell electricity to Europe at a price higher than the marginal cost. This suggests that a hypothetical Mediterranean market for electricity should be carefully regulated. (C) 2013 Elsevier B.V. All rights reserved.
An assessment of the optimal timing and size of investments in concentrated solar power
Ricci, Elena Claire
2013-01-01
Abstract
We extend the WITCH model to consider the possibility to produce and trade electricity generated by large-scale concentrated solar power plants (CSP) in highly productive areas that are connected to demand centers through High Voltage Direct Current cables. We test the attractiveness of the CSP option by imposing a global cap on Greenhouse gases concentration equal to 535 ppm CO2-eq in 2100, with and without constraints to the expansion of nuclear power and IGCC coal with carbon capture and storage (CCS). We find that it becomes optimal to produce with CSP from 2040 and to trade CSP electricity across the Mediterranean from 2050. Therefore projects like DESERTEC seem to be premature. After 2050, CSP electricity shares become significant. CSP has a high stabilization cost option value: depending on the constraints, it ranges between 2.1% and 4.1% of discounted GDP in the Middle East and North Africa (MENA), between 1.1. and 3.4 in China, between 0.2% and 1.2% in the USA, between 0.1 and 1.3% in Eastern Europe and between 0.1 and 0.4% in Western Europe. A moderate level of subsidy to invest more and earlier in CSP might increase welfare. However, large-scale deployment should occur after 2040. We also show that MENA countries have the incentive to form a cartel to sell electricity to Europe at a price higher than the marginal cost. This suggests that a hypothetical Mediterranean market for electricity should be carefully regulated. (C) 2013 Elsevier B.V. All rights reserved.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.